Adding a unit to your home in Ontario: what to check before you design
Provincial rules now allow additional residential units on many urban lots. Here is what decides whether yours can have one.
Read the article
Ontario now permits up to three residential units on many urban residential lots, for example a basement apartment and a garden suite alongside the main house. The details, however, are set by each municipality's zoning by-law, and they vary.
Before design starts, check four things: whether your zoning permits the unit type you want, whether the lot has the space and access the by-law requires, whether existing water, sewer and electrical services have capacity, and whether the building can meet fire separation, exit and ceiling height requirements.
A short feasibility review answers these questions before you spend money on full drawings. If the answer is yes, the same team can carry the project through design, permit and construction.
EngineeringOctober 2026
Removing a load-bearing wall: the steps that keep it safe
Open-concept layouts are popular, but the loads that wall carries still need somewhere to go.
Read the article
A load-bearing wall supports the floors and roof above it. When it is removed, a new beam has to carry that load, and the posts at each end have to bring it down to footings that can support it.
The process starts with an engineer confirming what the wall supports. The beam, posts and any new footings are then designed and drawn for a building permit. During construction, temporary shoring holds the structure up while the wall comes out and the beam goes in.
Skipping the engineering step is how sagging floors and cracked finishes happen years later. Done properly, the work is usually completed in days and inspected before the walls are closed.
AssessmentOctober 2026
What a building condition assessment tells you before you buy
A home inspection looks for problems. A condition assessment also tells you what they will cost and when.
Read the article
A building condition assessment reviews the structure, envelope, roofing and mechanical and electrical systems of a property, and estimates the remaining life of each.
For buyers and lenders, the most useful part is the capital plan: which repairs are needed now, which are coming in the next five to ten years, and roughly what they will cost. That turns an inspection into a number you can negotiate with.
For commercial and multi-unit properties, the assessment is often required by lenders. For older houses before a major renovation, it shows what has to be fixed before new finishes go in.
EnergyOctober 2026
Heat pumps in a Canadian climate: designing for real winters
Modern cold-climate heat pumps can heat a home through an Ontario winter, if the system is designed for it.
Read the article
Cold-climate air-source heat pumps keep working well below freezing, but their capacity drops as the outdoor temperature falls. Good design starts with an accurate heat-loss calculation for the coldest days, not a rule of thumb.
From there, the choices are about sizing, backup heat and distribution: whether existing ductwork can carry the airflow, whether a ducted or ductless system suits the house, and what provides heat during extreme cold snaps.
Improving the building envelope first, with air sealing, insulation and better windows, often allows a smaller and cheaper heat pump that runs more efficiently all year.
DeliveryOctober 2026
Why one coordinated team saves time and money
Most delays on building projects happen between consultants, not within them.
Read the article
On a typical project, the architect, the structural engineer, the mechanical and electrical engineers and the contractor are hired separately. Each produces good work, but their drawings are checked against each other late, and conflicts are found on site.
When the same group designs, engineers and builds, coordination happens from the start. Ducts are routed around beams before anything is drawn in detail, costs are checked while the design can still change, and questions on site are answered by people who already know the project.
The result is fewer change orders, a more reliable schedule and one point of contact for the client.